Sunday, July 15, 2007

The second bedroom is now boarded out. The tilers will put down a traditional floor over the underfloor heating pipes so that the tiles can be shifted into this room whilst the liquid concrete floor is put down throughout the rest of the barn. (allegedly the liquid floor takes 5 weeks to dry, but they have bought some dryers....)

No comments: