Monday, January 07, 2008

Friday, January 04, 2008


The bar - still due another beam so that you can get your legs under it.
Posted by Picasa
WC
Posted by Picasa
The little house - with driveway completed
Table ready for New Years Eve party
Very cold
It's cold down there.
The pool in progress - the concrete will be flowed today (4th Jan)

The master bedroom looking into the ensuite
The master bedroom

The second bedrooms ensuite - still needs the glass door on the shower.

The second bedroom
The third bedroom again.
The third bedroom

Thursday, January 03, 2008

The tree - decorated - 4.5m
Posted by Picasa

The table - laid
Posted by Picasa

The first gammon joint cooked in the Rayburn
Posted by Picasa

another pic of the salon.
Posted by Picasa

The first use of the Rayburn!
Posted by Picasa

The original features are stunning (as are the reindeer)
Posted by Picasa

The Sunday before Christmas and some more of our guests have arrived - decorating the tree.
Posted by Picasa
A warm welcome for our first guests
Posted by Picasa

God damn it - we got there.
Posted by Picasa

Lucy giving the kitchen a final wipe down before the guests arrive.
Posted by Picasa

Lucy giving the kitchen a final wipe down before the guests arrive.
Posted by Picasa

The fireplace is being used for the first time (by us). It has a great draw.
Posted by Picasa

Very last minute installation of the flue for the Rayburn. 1 hour till our first guests arrived.
Posted by Picasa

It has been a long time getting here but the final results are great. We still have to get the final lighting installed but I don't think it mattered too much.
Posted by Picasa

The furniture is perfect. It looks great. We have started dressing the house for when Lucy's mum arrives.
Posted by Picasa

The 22nd of December. Everything is ready (well almost) when we turned up. Our first guests arrive this evening.
Posted by Picasa