Friday, November 23, 2007

The painter...
Bathroom ceiling painted

Painting has started

Plaster is drying

The fireplace is almost done

Monday, November 19, 2007


The fireplace
John continuing with the painting.

barn
The garden is now looking a little bare.

I have still no idea how the geothermal heating works. Hopefully it will be able to deal with the temperature down here in the winter...
The garden has been completely turned over whilst the geothermal pipes went in.
Whilst the geothermal digging was taking place, we got them to remove the bamboo and tidy up generally. This is now the view from the kitchen patio.
The new fireplace - getting there
Master bedroom has now been plastered.

Edges now done.
The master bathroom is almost complete. Shower tap, head nd door still to go in.
Lucy and John in the master bedroom. The tilers have finished the skirting tiles.
The fireplace is finally started!
Plastering is now complete.
The rayburn is now in place. It still needs a flue to be connected though.
The kitchen...
Another view of the little house. The drive should be done this week in gravel.

The new roof! John has painted the outside of the little house and redone the shutters. Looking great.

The view from the other velux window in the little house.

The view from the new Velux window in the little house.

Wednesday, November 14, 2007

Another view of the hole!
This is the magic unit that sucks the heat out of the garden and puts it into the boiler...

more garden digging. John thought it was going to be a swimming pool...
The garden has been dug up for the underfloor geothermal heating pipes. 380 square meters!

Monday, November 12, 2007

We'll soon be water tight.
Skirting boards going on.
A little further on with the bathroom.
There were enought tiles left over to tile the WC

almost there...
Finishing the brickwork where the old electricity distribution board was - we can get on with the plastering after this is done.

The tiles have arrived for the white house
White house roof continues!

The roofers have turned up and started on the white house roof. John Marsdon is going down next week to paint the outside of the house and shutters.
Master bathroom - almost there

2nd bedroom finished tiling - nice builders have put down sheeting to protect.
2nd bathroom.

3rd bedroom tiles are grouted.
Sink almost ready to go in.
3rd bathroom pretty much finished tiling.
Hallway is complete and grouted.
The electricity board has gone - replaced with the board outside. The brickwork can begin again.
first socket in place.
Sockets starting to go in.
Dust sheets on the floor to protect the tiles. Getting ready to build the fireplace