Tuesday, October 30, 2007
EDF have put in the main cable, but not connected it to anything yet - they should be back today.
Bedroom 2 almost completed
Hallway completed
kitchen under wraps
Friday, October 26, 2007
I hope we have enough tiles left for the remaining floors! It's looking close.
Bauderie /Utility room tiling done.
Bedroom 3 tiling finished - still to be grouted
Bathroom 3 sink going in.
The floor of the second bedroom is prepped and ready for tiling
Master bedroom.
Tiles going down in the last bit of hallway. There is a man tiling in the bedroom and he has left himself an exit route.
Not a happy man.
Digging for the electricity - they are using a mole to go under the road to connect up to the mains.
EDF have arrived (early!!) and are installing the new meter
Tuesday, October 23, 2007
View from the dining room, out to the kitchen patio!
second bathroom shower tray (bac) completed.
Master bathroom - bath sides almost complete - shower tiled.
3rd bedroom tiles are down!
3rd bedroom with floor tiles almost finished, shower tiles down, shelf for the sink done and edges done.
New kitchen being used...
Looking through the bar into the kitchen. It looks really white because of the camera flash. It is a lot more cream coloured when seen normally.
The wine racks need filling up. This shouldn't be a problem.
The worktops still need another 3 coats of oil.
Strange angle..
The sink run. We still need to connect up the electrics and put the Rayburn in.
The drinks fridge - it is close to the patio doors so you can get a beer without coming too far into the house.
Dishwasher is in.
Worktops going on.
Nick, the kitchen fitter took photos whilst putting the kitchen in.
Tuesday, October 16, 2007
This is the size of the fireplace (to be) between the wooden sticks and to the tape measure....
Bathroom tiling continues.
Video of works.
Kitchen going in.
Hob.
Shower cubilcle almost finished. Still needs grouting to remove the joins.
WC now tiled - the tilers have agreed to tile the walls if there are any spare tiles left! (I think they are beginning to enjoy it!)
This is Nick the kitchen fitter - hard at work
The kitchen appliances arrived with the kitchen
Another Rayburn pic
tap
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
February 2005
(40)
March 2005
(25)
April 2005
(5)
May 2005
(24)
July 2005
(21)
September 2005
(24)
October 2005
(7)
March 2006
(3)
August 2006
(31)
September 2006
(59)
October 2006
(65)
November 2006
(44)
December 2006
(30)
January 2007
(34)
February 2007
(11)
March 2007
(16)
April 2007
(32)
May 2007
(30)
June 2007
(36)
July 2007
(28)
August 2007
(24)
September 2007
(31)
October 2007
(80)
November 2007
(51)
January 2008
(69)
February 2008
(27)
March 2008
(47)
April 2008
(13)
May 2008
(37)
June 2008
(44)
July 2008
(20)
February 2009
(6)
March 2009
(14)
April 2009
(12)
May 2009
(38)
June 2009
(7)
July 2009
(26)
September 2009
(13)
November 2009
(14)
June 2010
(14)
April 2012
(1)
About Me
Graham
View my complete profile