Thursday, April 12, 2007
I met with our new gardener when we were down over easter and have found out we have a lot of things that we didn't know we had. We have now identified the following edible things in our garden (if I remember correctly).
15 Walnut trees
2 sweet chestnut trees
1 lime tree
2 fig trees
1 peach tree
15 grape vines
1 cherry tree
2 plum trees
1 hazelnut tree
lots of mint and rosemary
We have to cut down 6 trees as they have had a good life and it is time for them to go...
15 Walnut trees
2 sweet chestnut trees
1 lime tree
2 fig trees
1 peach tree
15 grape vines
1 cherry tree
2 plum trees
1 hazelnut tree
lots of mint and rosemary
We have to cut down 6 trees as they have had a good life and it is time for them to go...
Just two hours before we are due to leave after going down to visit at easter, the window man turns up in a van, two of them actually. They take one of our windows out of the van, dissapear into the barn for a minute, reappear with the window, get back into the van and drive off. They didn't come back beforewe had to leave, but I snuck a look into the van to see what the windows looked like....

This is the interior wall of the salon and dining room. It is pretty much finished apart from sockets and switches. The floor will be a further 14 cm higher after the layer of screed that goes over the pipes, the underfloor heating pipes, the layer of liquid concrete that is going over the pipes and then the final layer of tiles.
Tuesday, March 27, 2007
Just spoken to Didier.
Electricity is done for this phase.
The doors and windows will be fitted next week. I've told him that the tiles will turn up from Morocco at the end of the week and he says don't worry, they will have at least one room secured with a locking door by that time (but should have the whole lot finished). He will talk to Mr Roumagere and Mr Vende to see if they can lend us a couple of workmen to help unload the tiles when they arrive, I need to send him the exact day so he can arrange.
He has not had time to do anything more on the little house roof. He will "keep it in his mind"….
He has spoken to Mr Magnieu (window man), who is getting him the model of the external doors today, so we can choose the correct internal doors. They are between €400 and €500 each door - so what we were expecting.
The master bathroom pipes have been moved already prior to the electrics going in - good.
He has only had one pool quote back so far out of the three that he requested. It is for €35k, we'll wait and see what the others come in at. He is mailing me this later today with the door model.
Didier is taking his gardener to Bellevue on Friday this week to get a quote for the pine tree and the bamboo. He wants to get a separate quote to do the rest of the land properly.
Electricity is done for this phase.
The doors and windows will be fitted next week. I've told him that the tiles will turn up from Morocco at the end of the week and he says don't worry, they will have at least one room secured with a locking door by that time (but should have the whole lot finished). He will talk to Mr Roumagere and Mr Vende to see if they can lend us a couple of workmen to help unload the tiles when they arrive, I need to send him the exact day so he can arrange.
He has not had time to do anything more on the little house roof. He will "keep it in his mind"….
He has spoken to Mr Magnieu (window man), who is getting him the model of the external doors today, so we can choose the correct internal doors. They are between €400 and €500 each door - so what we were expecting.
The master bathroom pipes have been moved already prior to the electrics going in - good.
He has only had one pool quote back so far out of the three that he requested. It is for €35k, we'll wait and see what the others come in at. He is mailing me this later today with the door model.
Didier is taking his gardener to Bellevue on Friday this week to get a quote for the pine tree and the bamboo. He wants to get a separate quote to do the rest of the land properly.
Saturday, March 24, 2007
The electricians have started!! they are putting in the cables before putting down another layer of screed. The wall at the far end has also beed dismantled as we need to move the doorway 50cm towards the left so that the en-suite bathrooms fit. The masons have also finished the columbage as the wiring is now in.
Tuesday, March 13, 2007
We have ordered 10cm x 10cm tiles as well as the 5x5. This is roughly how they will look. (This is from the website of the place we bought them from).The tiles will be shipped from Morocco along with all of the terracotta floor tiles. We've asked Didier (the architect) to make sure we have doors before they arrive at the end of the month.
John is down in France fixing the farmhouse floor after the rain got through the roof. We have the quote for replacing the roof but we will wait until the dry season until doing it. John has but down a membrane in the attic to save us from ruining the wooden floor again.
The electricians will start the first fit on Monday next week, putting down a 40mm floor on top of the electrics. After that is done and the windows are in we can start tiling and putting up the stud walls.
External doors, windows and shutters will turn up next week (we still don't know what they look like yet)
The electricians will start the first fit on Monday next week, putting down a 40mm floor on top of the electrics. After that is done and the windows are in we can start tiling and putting up the stud walls.
External doors, windows and shutters will turn up next week (we still don't know what they look like yet)