Sunday, March 25, 2007
Saturday, March 24, 2007
The electricians have started!! they are putting in the cables before putting down another layer of screed. The wall at the far end has also beed dismantled as we need to move the doorway 50cm towards the left so that the en-suite bathrooms fit. The masons have also finished the columbage as the wiring is now in.
Tuesday, March 13, 2007
We have ordered 10cm x 10cm tiles as well as the 5x5. This is roughly how they will look. (This is from the website of the place we bought them from).The tiles will be shipped from Morocco along with all of the terracotta floor tiles. We've asked Didier (the architect) to make sure we have doors before they arrive at the end of the month.
John is down in France fixing the farmhouse floor after the rain got through the roof. We have the quote for replacing the roof but we will wait until the dry season until doing it. John has but down a membrane in the attic to save us from ruining the wooden floor again.
The electricians will start the first fit on Monday next week, putting down a 40mm floor on top of the electrics. After that is done and the windows are in we can start tiling and putting up the stud walls.
External doors, windows and shutters will turn up next week (we still don't know what they look like yet)
The electricians will start the first fit on Monday next week, putting down a 40mm floor on top of the electrics. After that is done and the windows are in we can start tiling and putting up the stud walls.
External doors, windows and shutters will turn up next week (we still don't know what they look like yet)
Sunday, February 11, 2007
Tuesday, February 06, 2007
Tuesday, January 30, 2007